Sir Henrys - PMac’s Hospitality
Interior Design: Affect Design
Client Partnership PMac’s Hospitality
Compressed Timeline: Completing a full-scale renovation within just 10 weeks required meticulous planning and execution.
High-End Finishes: Integrating luxurious materials and bespoke design elements typically requires a longer lead time, which was limited in this scenario.
Off-Site Fabrication: Coordinating the fabrication and installation of custom elements from multiple suppliers to meet the short project timeline.
This renovation project for Sir Henrys by Affect Design aimed to revitalize a prestigious hospitality venue within a compressed 10-week timeline. The focus was on deploying high-end finishes and advanced off-site fabrication techniques to minimize downtime and revenue loss.
The vision was to not only refurbish Sir Henrys but to attract a higher-end clientele. The design centered on luxury and sophistication, with each element curated to enhance the overall ambiance while adhering to the aggressive timeline.
Sir Henrys - PMac’s Hospitality
Interior Design: Affect Design
Client Partnership PMac’s Hospitality
Compressed Timeline: Completing a full-scale renovation within just 10 weeks required meticulous planning and execution.
High-End Finishes: Integrating luxurious materials and bespoke design elements typically requires a longer lead time, which was limited in this scenario.
Off-Site Fabrication: Coordinating the fabrication and installation of custom elements from multiple suppliers to meet the short project timeline.
This renovation project for Sir Henrys by Affect Design aimed to revitalize a prestigious hospitality venue within a compressed 10-week timeline. The focus was on deploying high-end finishes and advanced off-site fabrication techniques to minimize downtime and revenue loss.
The vision was to not only refurbish Sir Henrys but to attract a higher-end clientele. The design centered on luxury and sophistication, with each element curated to enhance the overall ambiance while adhering to the aggressive timeline.
Gallery
Gallery
Challenges
- Project Management: Affect Design implemented rigorous project management protocols to ensure that each phase of the build-out was completed on time, from initial design through to final touches.
- Advanced Off-Site Fabrication: High-end finishes and bespoke fittings were fabricated off-site to expedite the assembly and finishing process within the venue, reducing on-site labor and time.
- Coordinated Logistics: Logistics were tightly managed to synchronize the arrival and installation of prefabricated components, ensuring smooth integration and continuity of work without delays.
Overcoming Challenges
This project showcases how even the most luxurious renovations can be accomplished swiftly without compromising on quality, setting a new standard for rapid hospitality transformations. Sir Henrys now enjoys a rejuvenated space that aligns with modern luxury standards, poised to attract and delight guests for years to come.